Sample package

Your tender package

Five documents and an Excel workbook, one estimate, all adding up to the same price. The pages below are from a real package, with the project details and figures changed and the line rates hidden.

Download the sample package (PDF)
What you receive

Real pages from a sample package

Tender Summary and Reports, Scope of Works and Tender Queries, Bill of Quantities with collection sheets, Materials Schedule, and Take-off Drawings. The BOQ, cost breakdown, summary, materials and resources also come as one Excel workbook, values only, with filters. Select a page to see it full size.

Only got five minutes? Read these first.
  1. Tender Summary: the total ex GST, and the optional items not in it
  2. Scope of Works: the exclusions and qualifications
  3. Drawing Register: check the revisions match your set
Cover The package cover: what's inside, and a detail of the water services take-off.
Tender Summary Your price on one page: collection by service, the commercial build-up with escalation, margin and contingency shown openly, and optional items priced separately.
Estimate Reports: Cost The same price cut by service and by work phase, with labour hours, crew days and the split between materials, labour, plant and lump sums.
Labour and Resources Labour by trade, crew and duration by phase, plant hire hours and subcontract packages, ready to programme the job and book hire.
Scope of Works Inclusions, exclusions, assumptions and qualifications written to protect your price, with the allowances stated in numbers so any overrun is a clear variation.
Tender Queries (RFIs) Raised during the measure and ready for you to send out, each with the drawing reference and the assumption priced if it isn't answered.
Bill of Quantities Every priced line grouped by service, drawing and room or zone. The fastest way to check a quantity or value a variation.
Collection Sheet and Cost Breakdown Every drawing total carried to the summary, and every BOQ line split into labour hours, labour, plant and materials.
Materials Schedule Every component in the scope with its quantity, including the fittings inside assemblies, ready for supplier quotes and ordering.
Take-off Drawings and Register Every run measured by size and material and every fitting counted on the consultant's drawing, with the register of drawings and revisions priced.
If You Win It (add-on after award) Once you've won the job, the tender turned into a working budget by cost code and a claim schedule by area and stage, from the same quantities you priced on. Priced separately.

Not shown: the page that maps each document to what you asked for, the scope notes on the main BOQ items, and the Excel workbook. Your package uses the same layout, with content specific to your job.

Want this for your next tender?

Send the drawings, specification and due date, and you'll have a fixed-fee proposal within one business day.

Send drawings See how it works